Projects



Project : Al.Salam City – U.M.Q
Client : Al.Tameer Sharjah
Contractor : Al Sehly building Contracting, wwl -Dubai
Location : Umm Al Quwain Emirates, U.A.E
Activities :

Setting out for landscape work providing data’s for the design and

layment.

Project : Jumeriah garden city - Meraas Sales Center
Client : Atkins consulting Engineers .Dubai
Contractor : Dubai Municipality
Location : Al- Tayer Stocks LLC.
Activities :

This project was carried out for finding out the existing Live & redundant services on the site like water service- Irrigation, gas, lighting / power etc.

Project : Dubai POLICE and ARMY residence
Client : Arif and Bintoak
Contractor : Engineers Office
Location : Al Naboodah LLC
Activities :

This project was carried out for setting out of lines and curves for the excavation of storm water, sewerage line, roads, and pump station by using GPS.

Project : Dubai Terminal 3 Extension
Client : AL NABOODHA .DUBAI.
Contractor : AL DAR.
Location : Dubai
Activities :

This project was carried out for setting out of center lines and surveying this project was carried out for setting out of Grid lines marking leveling and the alignment for all column and beams.

Project : Al Salam Street Tunnel Project
Client : Samsung – Saif Darwish-JV.
Contractor : PHARSON.
Location : Abu Dhabi
Activities :

This project was carried out for setting out of center lines and surveying this project was carried out for setting out of Grid lines marking leveling and the alignment for all column and beams.

Project : ADIC Tower
Client : WILLAM HARE UAE LLC.
Contractor : DAIR.
Location : Abu Dhabi
Activities :

This project was carried out for setting out of center lines and surveying this project was carried out for setting out of Grid lines marking leveling and the alignment for all column and beams.

Project : Falcon Eye Project – Airport Road
Client : MACE CONTRACTOR’S COMPANY LTD.
Location : Abu Dhabi
Activities :

This project was carried out for setting out of center lines and surveying this project was carried out for setting out of Grid lines marking leveling and the alignment for all column and beams.

Project : The Palm Jumeirah Projects
Client : Al Nakheel, Dubai
Consultant : Associated Consulting Engineers, Dubai
Activities :

Establishing control station, Bench mark, Topographical survey, Producing Drawings, Take out for cut and fill of earthworks, Checking and recording of final grading levels, volume calculation etc,

Project : Dubai Investment Park Development Phase III
Client : Jebel Ali Free Zone Authority, Dubai
Consultant : Khatib & Alami Consolidated Engineering Company
Activities :

Establishing control station, Benchmark, Topographical survey, Producing Drawings, Take out for cut and fill of earthworks, Checking and recording of final grading levels, volume calculation etc.

Project : International City Project
Client : Al Nakheel
Consultant : Associated Consulting Engineers
Activities :

Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking and recording of final grading levels, volume calculation, 27 Residential buildings setting outs, Grid line set up, etc.

Project : Phase 2 – Green Line
Client : JT METRO JV
Consultant : Systra Engineering
Activities :

Establishing control stations, Benchmark, Topographical survey, Producing Drawings, Take out for cut and fill of earthworks, taking the survey details for different sections etc. This project was carried out for setting out of Grid lines in all stations. Surveying all the Ribs for proper alignment during steel erection in all the stations. Surveying the steel stairs in all the stations for proper alignment and level. The whole survey work is done in all station for both civil and building sections The survey work is done on all the underground tunnel stations for both Red line and Green line for both civil and building section marking grid lines, center lines, leveling and the alignment for all steel column and beams done for all the foot bridge in all Red line stations

Project : Dubai Pearl Residence Tower C2 & C3
Client : Swiss boring
Consultant : Hyder Consultant Engineering
Activities :

Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking final grading levels, volume calculation, Grid line set up, etc.

Project : Road Project, Fujairah
Client : Fujairah Municipality
Consultant : Dhawi Engineering
Activities :

Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking final grading levels, volume calculation, Grid line set up, etc.

Project : Travel Lift Jetty-Umm Al Quwain
Client : Hariyah Free Zone Corporation, Sharjah
Consultant : Target Marin, Abu Dhabi
Activities :

Piling setting outs and as built Preparation.

Project : R881/1-Comprehensive Improvements of the Parallel Road.
Client : ROAD AND TRANSPORT AUTHORITY.DUBAI.
Consultant : M/S.PARSON DELU CATHER .DUBAI.
Location : West and East Parallel Roads at Al Bahrsha, Al Quiz
Activities :

39 K.M. Topographical survey Work done for ETISALAT underground line for the N. O. C. we Produced Drawings too. Also NES has taken exixisting ground level for 33K.M.

Project : M/S.AL GHURAIR CITY EXPANSION PHASE 2
Client : AL GHURAIR CITY.
Consultant : ARIS ENGINEERS.
Contractor : Middle East Foundation Group. Dubai.
Activities :

Establishing control station, Bench mark, Ground settlement Marking verification, and pile setting out

Project : VH01/C02- Victory Heights Golf & Residential Development LLC
Client : Dubai Sports City
Consultant : Khaki & Alami Consolidated Engineering CO.
Contractor : Wade Adams Contracting (LLC).
Activities :

Topographical Survey done for all the 11 K.V AND 132 K.V Sub Stations, Golf Course, Estella, Esmeralda, Carman, Novelia, Oliva, And Calida Zones Roads and Infrastructure survey too.

Project : LA Ville Contemporaine Business Bay.
Client : Dubai Properties.
Consultant : Hal crow Consulting Engineers.
Contractor : Al Naboodha Engineering Services.
Location   Business bay
Activities :

Strom Water Drainage network and Sewerage line Net work layout setting, Trench formation leveling, Pipe slope inspection, Manhole inlet and outlet inspection and Manhole Construction.

Project : Jebel Ali Airport city- Phase 1
Client : Department of civil aviation –Dubai.
Consultant : K & A and METCALF & EDDY (KAME)
Contractor : Arabtec Engineering Services wwc
Location   Dubai World International Airport – Jebel Ali
Activities :

Verifying the original ground level, setting out for storm water and sewerage pipe lines, construction of 6ponds, fixing of control points and day to day site survey activities

Project : Palm Jumeriah Pile Shoring.
Client : M/S Nakheel Dubai.
Consultant : Parson Consulting Engineers Dubai.
Contractor : Taishaw, Dubai
Location   Palm Jumeriah Fond Areas
Activities :

Setting out of pile shoring, level inspection and Day to day site survey activities.

Project : YAS ISLAND
Contractor : M/ S MERO (Middle East L.L.C)
Location : Yas –island Abu Dhabi.
Activities :

Establishing control station, Benchmark , Topographical survey, Take out for cut and fill of earthworks, checking and recording of final grading levels, volume calculation etc.


BURJ kHALIFA Tower
Raft Foundation of BURJ kHALIFA Tower to be the tallest building
in the world. ( June 2004 – November 2004 )
 
Our Senior Surveyor work in the preliminary set-up of site control network applying the best fit for the raft foundation. Run vertical and horizontal control around the perimeter of the raft foundation to be used for setting out of raft limit prior to concrete casting. Establish a coordinated long reference point for the stability of control network with the use of repeated observations of angle to eliminate angular error to counter the extreme condition and high temperature in Dubai as a preparation for the long vertical transfer of control point.
   
The Gate Dubai International Financial Center (June 2003 –June 2004)
 
Our Senior Surveyor worked as Head in Survey Department establish all main control point for the positioning of raft foundation. Run main vertical control point from DM benchmark to site location. He devised method of statement for specific project, work along side with the Executive Project Manager applying the project Management Program for the easy and sure way of implementing and delivering the work to the international standard.
   
Grosvenor House and Apartment Project (November 2002 – June 2003)
 
Our Senior Surveyor worked as head in Survey Department established all main control point for the positioning of raft foundation. Run main vertical control point from DM benchmark to site location. Execution of daily construction activity, making progressive as built-survey, transferring of grids of control points via penetration holes. Devised method of statement for the whole building construction.
   
Dubai Marina Six Towers Project (November 2001 – November 2002)
 
Devised Method of statement for the building construction of six towers of the project, our Senior Surveyor worked as Head in Survey Section at South Area. Rotate all control network in accordance to the skewed angle relative to the North area. Control four survey parties including carpark and podium of the South Area.
   
Burj Al Arab Hotel The 1st Seven Star Hotel in the World
(July 1996 – November 1997)

 
Our Senior Surveyor worked with Al Habtoor-Fletcher-Murray and Roberts and Joint Venture with MAXBRAID Surveyor (MBS).  Provided control survey for both horizontal and vertical relative to the external control points provided by Dubai Municipality.  Island movement control and exoskeleton primary control points.  Using the grid system to check the external control transferred to the island against the design position of the world’s tallest hotel structure.
   
Dubai Grand Hyatt Tower Complex (October 1999 – October 2000)
 

Our Survey Manager worked to control and handle six survey party involve in all survey work for the project itself.  Make preparation of all data to be set out for the four towers on day to day activities.  Coordinate and  follow up drawing  issuance as well as revisions with the Head of Engineering Department in accordance to the site condition.